Hi all,
I have transported some input schedules and a dimension that is used in those input schedules from DEV to QA in a single transport. For some reason the context lock for only that particular dimension isn't present anymore in QA-system. I am aware of OSS-note 1710175 - BPC10 NW Context lock options are lost after Transport and note 1821026 - EPM-XLS - Context Lock settings lost after transport, but both apply to older SP's than ours (we are on BPC 10.0 NW SP4 and EPM add-in SP15 patch 2).
I tried retransporting only the input schedules again, but the context is still unlocked for that particular dimension. Is this bug still present in later SP's or am I missing something?!
Kind regards,
Matthias