Dear All
We have installed NW 7.31 ABAP Stack and BPC 10.0 addon installed. ABAP Stack SP is 03 whereas BPC is on patch 02
Following the guide, we have performed the steps as suggested by SAP and are facing a connectivity issue while using EPM addon on Excel
The error is The environment ‘Environment Shell’ is unavailable. Some functions may be unavailable.
This error is reported in SAP Note number: 1766132. However, even after activating the listed suggestions, the error is still there.
The user we are using has SAP_ALL rights in addition to (*BPC* & *POA*) Roles.
INFO:
- Our BPC 10 servers lies over NW7.31 ABAP Stack.
- This ABAP Stack will in return communicate with BW 7.01 which in actual is our BW Server.
- RSA1 has been set for NW7.31 Stack
- UPJ_ACTIVATION_CONTENT report was executed with no errors.
- If we goto the weblink: http://sap-bpc-nw:8000/sap/bpc/web : Following errors are thrown:
- cannot find com_sap_tc_ui_ria_fcp* plgin
- environment environmentshell is currently offline
Perhaps you can share your experiences to resolve the issue.
Thank you very much